Overloaded 31’s

To start this section off, here are 2 logs of overloaded Class 31s on the ECML in situations where somewhat bigger power was expected and, perhaps, would have been more appropriate.

Date :- April 07, 1965

Train :- 1B04 0733 Newark Northgate-King’s Cross

Locomotive :- D5672 (34G)

Load :- 10 coaches, 337 tons tare

0.00.   Northgate.                   0           0      00.               –              

4.73    Claypole                     (3)          8.    03.              52

8.64.   Hougham                                12.    18.           55/64 

10.40. Barkston South           15        14.    23.           58/52

                    Junction

14.65. Grantham                    21        20.    29               –

0.00                                          0         0      00               –

3.35    Great Ponton                            6      34           38/48

4.13    High Dyke                                 7      44           46/43

5.34    Stoke Summit               6          9      34           38/41

8.36.   Corby Glen                              12.    42        57/66/70

13.23.  Little Bytham                           16.   30            77/84

16.82   Essendine                  18         19.   04.              86

20.62.  Tallington                                 21.   39            86/88

23.57.  Helpston                                  23    45               84

25.95   Werrington Junction   21         25.   43            76/*63

27.39   New England North                 27.   20               57

29.10   Peterborough             26         30.   02                –

0.00                                         0           0     00                –

1.38     Fletton Junction                        2     52            44/46

3.75.    Yaxley and Farcet                     5     51            48/53

6.99.    Holme                         (3)          9.    04               66

12.88   Abbot’s Ripton                         14    43             59/63

17.65   Huntingdon                 21         19.   16                65

20.47.  Offord and Buckden                 22    05               *63

24.59.  St. Neot’s                                 26.    00                65

                                                               PWS                 *20

28.81   Tempsford                                32     46             41/52 

32.19.  Sandy                         33          36     20                64 

35.16   Biggleswade                             39.    16             62/58

39.28   Arlesey                       (3)          43.    21                62

40.63.  Three Counties                         44.    50                57

44.40   Hitchin                        45           48.    18                66

48.77.  Stevenage                                 52.    07            55/53

51.33.  Knebworth                  51.5        55     51               58

54.37.  Welwyn North                            58.    44            62/64

56.05.  Welwyn Garden City                  60.    10               66

58.68.  Hatfield                        57.5        62.   16            72/73

63.65.  Potter’s Bar                 62           67.    01            65/62

65.78.  Hadley Wood                             68.    57                64

67.21.  New Barnet                                70.    05                70

72.31.  Hornsey                                      74     16            73/70

73.85.  Finsbury Park             71.5         75     50            62/57

                                                                  sigs                   *10

76.36   King’s Cross               77            81.    38                – 

It was some years before I was fortunate (??) enough to encounter another 31 on the ECML main line.  It was the same train, now starting back at Lincoln St. Marks at 0725 with an additional stop at Huntingdon and now loading 11 coaches!!

Date :- September 07, 1968

Train :- 1B04 0725 Lincoln St. Mark’s-King’s Cross

Locomotive :- D5613 (34G)

Load :- 11 coaches, 371 tons tare 

0.00.    Northgate                     0                0.  00                – 

4.73     Claypole                      (3)              7.  11        48/52/57

8.64.    Hougham                                     10.  56           65/57

10 40.  Barkston South           12             12.  42.            56

                    Junction

12.69   Peascliffe Tunnel N                      14.  04           58/55

13.98.  Barrowby Road                            16.  33         66/52/41

14.65.  Grantham                    16.5          18.  11              –

0.00                                           0               0.  00             –

3.35     Great Ponton                                  6.  18          42/49

4.13.    High Dyke                                       7.  18          48/43

5.34     Stoke Summit               5.5             8.  49          44/51

8.36.    Corby Glen                                    11   38          68/78

13.23.  Little Bytham                                 15.  09             85

16.82.  Essendine                   13.5           17.  37          82/86

20.62.  Tallington                                       20.  20             83

23.57   Helpston                                        22.  24             86

25.95   Werrington Junction    20.5           24.  29          76*55 

27.39   New England North                       26.  08          52/49

29.10   Peterborough              25.5           28.  49              –

0.00                                          0                0.   00              –

1.38     Fletton Junction                              3    02         46/51

3.75     Yaxley and Farcet                           5    48         56/58

6.99.    Holme                                             8.   43         71/65

12.88.  Abbot’s Ripton                               14.  14         63/53

17.65.  Huntingdon                  18              19.  25            –

0.00                                          0                 0.  00.           –

2.92.   Offord and Buckden                         4.  47         51/60

7.14.   St. Neot’s                                         8.   56        61/65

11.34.  Tempsford                                      12.  37        71/75

14.74.  Sandy                          13              15.  19            75

17.71   Biggleswade                                  17.  43            75

21.83.  Arlesey                         (4)             21.  08.        74/70

23.18   Three Counties                              22   19            72

26.95.  Hitchin                          25.5           25.  33         72/68 

30.30   Stevenage Old                               28.  49         66/57

33.85.  Knebworth                                      32.  07         65/68 

36.88.  Welwyn North                                 34.  49         66/71

38.52.  Welwyn Garden City                       36.  11            73 

41.17.  Hatfield                         38.5            38.  15        75/78

44.36.  Brookman’s Park                             41.  09        68/65

46.05.  Potter’s Bar                   42.5            42.  40.          72

48.22.  Hadley Wood                                   44.  30           66

49.67.  New Barnet                                      45.  39        73/78

52.34.  New Southgate                                47.  49           75 

54.70.  Hornsey                                           49.  52      72/67/60

                                                                       sigs             *35

56.33.  Finsbury Park               52               51.  48           54

58.84.  King’s Cross                 57               57.  28             –    

Now I think that both of these performances come under the heading of “gallant efforts”, even though, if one were being more cynical, the statement “if it had not been for recovery time…….” would be of relevance.

31257  1733 Carlisle – Euston rtn “Pennine Summits” Tour

At Rugby the tour’s booked AC loco to Euston had vanished, this seemed to happen a lot on 40 tours! Sadly the 40’s didn’t go through, and to a huge round of laughter 31257 appeared to work the tour forward.

The laughter was perhaps on the other foot once past Kilsby summit, with a top driver, and a healthy steed in 31257, load 14 was moved at very respectable speeds South (see log below). A Watford leap and a 310 home to end a wonderful day out.

Via Weedon at very unpedestrian speeds!

The flying “ped”, 31257’s  finest hour!

                                    Sched                          Actual             Var     Av Speed

Rugby                         2137                            2155                +18      ……….

Weedon                      2146                            2212                +26      45

Hanslope                    2154                            2222                +28      80       

Bletchley                     2205                            2232                +37      58.5

Leighton                                                         2237                            75                   

Tring                          2215                            2246                +31      56.6

Berko                                                              2249                            80

Hemel                                                             2252                            54.3    

Apsley                                                             2253                            60.1

Kings L                                                          2255                            56.6

Watford Jn                2225                            2259                +34      54       

From Weedon to Watford only 8 minutes were lost on electric timings, not bad for a ped

end